A report on China Public Charging Pile Operation Report Industry Market Report 2023-2027 shows that the number of public charging piles in China reached 424.3 million in 2025, and is projected to reach 542.9 million by 2027, representing an average growth rate of 13%. The total charging volume of public charging piles in China reached 76.9 billion kWh in 2025, and is projected to reach 108.9 billion kWh by 2027, with an average growth rate of approximately 20%.
In 2025, TELD had 905,000 public charging stations, and Star Charge had 803,000. Although Orange Energy only had 302,000, as a public charging station company under Didi, its utilization rate was very high. In 2027, Orange Energy is projected to rank first in the market with 23.8 billion kWh of charging, followed by TELD with 20.3 billion kWh. While Orange Energy is projected to have only 451,000 charging stations in 2027, compared to TELD’s 1.125 million, this is significant.
In terms of revenue rankings, Star Charge is projected to reach $3.077 billion in 2027, ranking first in the industry, while TELD’s revenue is expected to reach $2.233 billion, ranking second. Although Orange Energy boasts the highest charging capacity, its revenue only reaches $714 million due to its operator model.
In China’s public charging station operation market, TELD and Star Charge initially built their own charging stations, operating as self-operators. However, with the rapid development of the market, operating platforms like YKC have emerged. These platforms don’t build charging stations themselves but integrate smaller charging station operators, handling all operations themselves.
There are two main operating models in the Chinese market. The first is building charging stations independently or through partnerships; the second is the platform operator model, where platform operators typically take a 15% commission but do not build charging stations themselves. The price of a single public charging station in the Chinese market is approximately $20,000 to $30,000.
Among the companies surveyed in the report, Star Charge has the highest valuation at $2.5 billion, followed by TELD at $1.8 billion. The report shows that China will add 3.81 million charging piles in 2025, including 1.045 million public charging piles and 2.765 million private charging piles. The vehicle-to-charging-pile ratio in China is expected to reach 2:1 by 2025 and is projected to reach 1:1 by 2030.
To obtain the complete “China Public Charging Pile Operation Industry Market Report 2023-2027”, please contact us (you can fill in your company’s name and email address). We will also provide one year of after-sales service for this report.
China Public Charging Pile Operation Industry Market Report 2023-2027
Price: Single License $1288, Enterprise License $2688
Region: China
Pages: 35
Report Release Date: November 2025
China Public Charging Pile Operation Industry Market Report 2023-2027 is a professional and in-depth market report on the Chinese Public Charging Pile Operation industry. This report provides a comprehensive overview of the Public Charging Pile Operation industry, with data comprising 50% of the content, making it a comprehensive data report on the Chinese Public Charging Pile Operation industry.
This report introduces basic information about the Public Charging Pile Operation industry, including its definition, classification, applications, and industry chain overview. It then delves into the production status, financing situation, detailed data, and business cooperation of Public Charging Pile Operation companies in China.
Finally, the report introduces the future development of China’s Public Charging Pile Operation industry.
In summary, this is an in-depth data research report on China’s Public Charging Pile Operation industry. We thank the experts in the Chinese Public Charging Pile Operation industry for their support and assistance.
The report consists of three parts: Part One provides an overview of the industry; Part Two details the key players; and Part Three outlines future development trends and provides a summary.
Table of contents
Part 1 6
Chapter 1 Market Overview 6
1.1 Definition of Public Charging Pile Operation 6
Table: Analysis of Public Charging Pile Operation 7
1.2 Classification of Public Charging Pile Operation 7
Table: Analysis of Public Charging Pile Operation Classification 8
1.3 Public Charging Pile Operation Industry Chain 8
Figure: Analysis of Public Charging Pile Operation Industry Chain 8
Chapter 2 Industry Data Overview 9
2.1 Public Charging Pile Operation Market Analysis 9
Table: Analysis of China’s Automotive Market 9
Table: Market Analysis of Public Charging Pile Operation 9
2.2 Public Charging Pile Operation Company Data Analysis 9
Table: Market Analysis of Planned Capacity of Public Charging Pile Operation Companies 9
Table: Public Charging Pile Operation Company Production Capacity Market Analysis 11
Table: Public Charging Pile Operation Company Production Capacity Market Share Analysis 11
Table: Public Charging Pile Operation Company Shipment Market Analysis 11
Table: Public Charging Pile Operation Company Shipment Market Share Analysis 11
Table: Public Charging Pile Operation Company Revenue Market Analysis 12
Table: Public Charging Pile Operation Company Team Size Market Analysis 12
Part Two 13
Chapter Three Analysis of Major Public Charging Pile Operation Companies 13
3.1 TELD 13
3.1.1 Company Introduction 13
3.1.2 Company Financing History 13
3.1.3 Company Production Capacity 13
3.1.4 Company Technology Roadmap 14
3.1.5 Company Business Cooperation 14
3.1.6 Company Product Introduction 14
Table: Public Charging Pile Operation Product Introduction 14
3.1.7 Company Data Analysis 14
Table: Company Revenue Data Analysis 14
3.2 StarCharge 15
3.2.1 Company Introduction 15
3.2.2 Company Financing History 15
3.2.3 Company Production Capacity 15
3.2.4 Company Technology Roadmap 16
3.2.5 Company Business Cooperation 16
3.2.6 Company Product Introduction 16
Table: Public Charging Pile Operation Product Introduction 16
3.2.7 Company Data Analysis 16
Table: Company Revenue Data Analysis 16
3.3 YKC 17
3.3.1 Company Introduction 17
3.3.2 Company Financing History 17
3.3.3 Company Production Capacity 18
3.3.4 Company Technology Roadmap 18
3.3.5 Company Business Cooperation 19
3.3.6 Company Product Introduction 19
Table: Public Charging Pile Operation Product Introduction 19
3.3.7 Company Data Analysis 19
Table: Company Revenue Data Analysis 19
3.4 Orange Energy (DIDI) 20
3.4.1 Company Introduction 20
3.4.2 Company Financing History 20
3.4.3 Company Production Capacity 21
3.4.4 Company Technology Roadmap 21
3.4.5 Company Business Cooperation 22
3.4.6 Company Product Introduction 22
Table: Public Charging Pile Operation Product Introduction 22
3.4.7 Company Data Analysis 22
Table: Company Revenue Data Analysis 22
3.5 SGCC 23
3.5.1 Company Introduction 23
3.5.2 Company Financing History 23
3.5.3 Company Production Capacity 24
3.5.4 Company Technology Roadmap 24
3.5.5 Company Business Cooperation 24
3.5.6 Company Product Introduction 25
Table: Public Charging Pile Operation Product Introduction 25
3.5.7 Company Data Analysis 25
Table: Company Revenue Data Analysis 25
3.6 CSG 26
3.6.1 Company Introduction 26
3.6.2 Company Financing History 26
3.6.3 Company Production Capacity 26
3.6.4 Company Technology Roadmap 26
3.6.5 Company Business Cooperation 27
3.6.6 Company Product Introduction 28
Table: Public Charging Pile Operation Product Introduction 28
3.6.7 Company Data Analysis 29
Table: Company Revenue Data Analysis 29
3.7 EVking 30
3.7.1 Company Introduction 30
3.7.2 Company Financing History 31
3.7.3 Company Production Capacity 31
3.7.4 Company Technology Roadmap 32
3.7.5 Company Business Cooperation 32
3.7.6 Company Product Introduction 33
Table: Public Charging Pile Operation Product Introduction 33
3.7.7 Company Data Analysis 34
Table: Company Revenue Data Analysis 34
Part Three 35
Chapter Four: Analysis of Future Development Trends of Public Charging Pile Operation 35
Disclaimer 35
